Electrical estimating glossary
Key terms around quantity takeoff, bills of quantities and bids in German electrical contracting — short and clear.
Updated
- Additional and reduced quantities
- The difference between old and new quantity per position when plans or scope change. Additional quantities raise the order value, reduced quantities lower it. Learn more →
- AI symbol recognition
- Computer-vision models that recognise and count symbols on plans visually, without relying on CAD layers. Monco Smart Surveyor reaches 99 % accuracy on reviewed sheets this way. Learn more →
- Aufmaß (as-built measurement)
- Measuring the quantities actually installed, usually as the basis for invoicing. Unlike the takeoff before the bid, the Aufmaß measures what was built. Learn more →
- BMA (fire alarm system)
- The system that detects and reports fires, made up of detectors, manual call points and a control panel. Usually its own trade with its own symbols on electrical plans.
- Cable tray
- A support system (cable trough, wire mesh tray or cable ladder) that carries cables. In pricing, trays are counted in running metres. Learn more →
- Electrical estimating
- Pricing electrical installation work: quantities from the plans, material and labour cost per position, overheads. The result is the bid. Learn more →
- GAEB / GAEB XML
- The German standard for exchanging bills of quantities between planners, owners and contractors, published by the Gemeinsamer Ausschuss Elektronik im Bauwesen. GAEB XML is the current file format. Learn more →
- Leistungsverzeichnis (LV, bill of quantities)
- The tender's list of all work items, structured into positions with description, unit and quantity — the German bill of quantities. The contractor enters prices into the LV and submits it as the bid. Learn more →
- Lump-sum bid (Pauschalangebot)
- A bid at a fixed total price instead of unit prices. The contractor carries the quantity risk, so the quantities have to be taken from the plans by the contractor. Learn more →
- LV matching
- Comparing quantities taken from the plans with the positions and quantities in the bill of quantities, to see which positions are missing, added or have different quantities. Learn more →
- LV position
- A single line in the bill of quantities, e.g. 'supply and install double flush-mounted outlet', with a position number, unit and quantity. Learn more →
- Massenermittlung (quantity takeoff)
- German term for quantity takeoff: capturing all counts, lengths and areas from construction plans as the basis for pricing and the bid. In electrical work this mainly means counting symbols such as outlets, switches and luminaires and measuring cable trays. Usually used interchangeably with Mengenermittlung. Learn more →
- Mengenermittlung
- Same meaning as Massenermittlung: determining quantities from the plans, which then feed into pricing and the bid. Learn more →
- Nachtrag (change order)
- A supplementary offer for work that changes or is added after the contract is signed — often triggered by a new plan revision. It is based on the additional and reduced quantities compared with the original order. Learn more →
- Plan legend
- The key on the plan that explains what each symbol means. A complete legend is the best basis for automatic symbol recognition. Learn more →
- Plan revision (Planindex)
- The revision marker of a plan, e.g. index A, B, C. Each new index stands for a changed version of the plan. Learn more →
- Power and low voltage
- Power (Starkstrom) covers energy supply: outlets, distribution boards, lighting. Low voltage (Schwachstrom) covers communication and safety systems such as data, telephone, fire alarm and intercom. Plans and bills of quantities usually treat them as separate trades.
- Takeoff
- Short for quantity takeoff: counting and measuring everything on the plans that has to be priced. AI takeoff software detects and counts elements on plans automatically. Learn more →